1. Angola
1.1 Project: Construction and operation of 240km transmission line (Lauca)
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common ApproachesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Reinsurance (to EKF, Danish ECA)Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Health and safetyÂ
-
Noise and air qualityÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌýÌý
-
Physical resettlement and economic displacementÂ
-
Waste managementÂ
Monitoring summaryÂ
Self-monitoring report received and reviewed by IESC and lenders; UKEF coordinating with EKF in reviewing and responding.
2. µþ²¹³ó°ù²¹¾±²ÔÌý
2.1 Project: Upgrade and modernisation of the existing BAPCO refineryÂ
Year of issueÂ
2019-20Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project Finance / Direct Loan / Buyer Credit GuaranteeÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Environmental pollutionÂ
-
Health and safetyÂ
-
Noise and air qualityÂ
-
Waste managementÂ
-
Labour and Working Condition Â
Monitoring summaryÂ
Monitoring report from ERM received and reviewed in June 2024. The project is facing challenges due to Downtown subcontractor’s failure to pay workers’ salaries. UKEF will continue to monitor the project until this issue is resolved.
3. µþ±ð±ô²µ¾±³Ü³¾Ìý
3.1 Project: Design, engineering, procurement, construction, commissioning, operation and maintenance of a 1,450 kta ethane cracker and associated transportation, storage and utilities infrastructure (Project One) located at the Port of Antwerp, Belgium (INEOS Project ONE)Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project Finance - Buyer Credit GuaranteeÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
climate change
-
biodiversity
-
occupational health and safety
-
emissions to the atmosphere (including land, air and water)
-
waste and hazardous material management
-
emergency planning and response
-
community health and safety andÂ
-
community engagement Â
Monitoring summaryÂ
IESC’s second monitoring report received and reviewed. No major issues to be reported.
4. µþ°ù²¹³ú¾±±ôÌý
4.1 Project: Petrobras oil and gas exploration and production in three offshore Brazilian basins, Line of Credit (LOC) Phase IÂ
Year of issueÂ
2011-12Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Line of Credit GuaranteeÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safetyÂ
-
Waste managementÂ
-
Community safety / stakeholder engagementÂ
-
Emergency responseÂ
-
¶Ù±ð³¦´Ç³¾³¾¾±²õ²õ¾±´Ç²Ô¾±²Ô²µÌýÌý
Monitoring summaryÂ
Monitoring related to Petrobras Phase I is included within monitoring of Petrobras LOC III.
4.2 Project: Petrobras oil and gas exploration and production in three offshore Brazilian basins, Line of Credit (LOC) Phase IIÂ
Year of issueÂ
2015-16Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Line of Credit GuaranteeÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safetyÂ
-
Waste managementÂ
-
Community safety / stakeholder engagementÂ
-
Emergency responseÂ
-
¶Ù±ð³¦´Ç³¾³¾¾±²õ²õ¾±´Ç²Ô¾±²Ô²µÌýÌý
Monitoring summaryÂ
Monitoring related to Petrobras Phase II is included within monitoring of Petrobras LOC III.
4.3 Project: Petrobras oil and gas exploration and production in three offshore Brazilian basins, Line of Credit (LOC) Phase IIIÂ
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Line of Credit GuaranteeÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safetyÂ
-
Waste managementÂ
-
Community safety / stakeholder engagementÂ
-
Emergency responseÂ
-
¶Ù±ð³¦´Ç³¾³¾¾±²õ²õ¾±´Ç²Ô¾±²Ô²µÌýÌý
Monitoring summaryÂ
Monitoring reports received and reviewed.
5. ·¡²µ²â±è³ÙÌý
5.1 Project: Design, construction, operation and maintenance of two monorail lines (Cairo Monorails)Â
Year of issueÂ
2020-21Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit GuaranteeÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Health and safetyÂ
-
Air, noise and soil quality Â
-
Wastewater and waste managementÂ
-
Physical and economic displacementÂ
-
Cultural heritage Â
Monitoring summaryÂ
IESC reports received and reviewed. Several issues and potential breaches of the E&S obligations reported during this financial year.
6. ³Ò³ó²¹²Ô²¹Ìý
6.1 Project: Development of oil and gas exploration and production facilities in the offshore Sankofa and Gye Nyame gas fields and Sankofa East oil field, part of the Offshore Cape Three Points (OCTP) block, utilising a floating production, storage and offloading unit (FPSO) and an onshore gas receiving facility (ORF)Â
Year of issueÂ
2016-17Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct Lending Â
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safety / contractor managementÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Emergency responseÂ
-
¶Ù±ð³¦´Ç³¾³¾¾±²õ²õ¾±´Ç²Ô¾±²Ô²µÌýÌý
Monitoring summaryÂ
IESC annual monitoring report received and reviewed.
6.2 Project: Rehabilitation and upgrade of an existing road, (Bolgatanga)Â
Year of issueÂ
2021-22Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct Lending Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Worker and community health and safetyÂ
-
Physical and economic displacementÂ
-
Emissions to the atmosphere (including land, air and water, and climate change)Â
-
Traffic management and road safetyÂ
-
Wastewater treatmentÂ
-
Waste and hazardous material managementÂ
-
Community engagement Â
Monitoring summaryÂ
Construction self-monitoring report received and reviewed in early 2022; in December 2022 Project was suspended due to Ghana Ministry of Finance announcing suspension of payments on selected external debts. The Project has not yet restarted.
6.3 Project: Upgrade of the Tema-Alfao Road, ³Ò³ó²¹²Ô²¹Ìý
Year of issueÂ
2020-21Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct Lending Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Air emissions Â
-
Noise and vibrationÂ
-
Waste managementÂ
-
Land acquisition and livelihood impactsÂ
-
Occupational and community health and safetyÂ
-
Worker welfareÂ
-
Community engagementÂ
Monitoring summaryÂ
Construction self-monitoring report received and reviewed in early 2022; in December 2022 Ghana Ministry of Finance announcing suspension of payments on selected external debts, including the Project. Construction works have largely been put on hold since then.
7. ±õ²Ô»å¾±²¹Ìý
7.1 Project: Design and supply of goods for upgrade and expansion of a petrochemical plant Â
Year of issueÂ
2014-15Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit GuaranteeÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safety and securityÂ
-
Waste managementÂ
-
Social issues / stakeholder engagementÂ
Monitoring summaryÂ
No known material environmental or social issues.
8. ±õ°ù²¹±çÌýÌý
8.1 Project: Construction and operation of a 750MW power station (Dhiqar)Â
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct LendingÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Health and safety Â
-
Noise and air qualityÂ
-
Wastewater and waste managementÂ
-
Resource efficiencyÂ
Monitoring summaryÂ
No IESC reports or self-monitoring reports have been received this year. A reservation of rights letter has been shared with the buyer and borrower.
8.2 Project: Construction and operation of a 750MW power station (Samawa)Â
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct LendingÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Health and safety Â
-
Noise and air qualityÂ
-
Wastewater and waste managementÂ
-
Resource efficiencyÂ
Monitoring summaryÂ
No IESC reports or self-monitoring reports have been received this year. A reservation of rights letter has been shared with the buyer and borrower.
9. °³Ü·É²¹¾±³ÙÌý
9.1 Project: KNPC Clean Fuel Project (CDP)Â
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
9.2 ±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Health and safety Â
-
Noise and air qualityÂ
-
Waste managementÂ
-
Soil, Groundwater and Surface Water ContaminationÂ
-
Worker welfareÂ
Monitoring summaryÂ
IESC monitoring report received and reviewed.
10. ²Ñ´Ç³ú²¹³¾²ú¾±±ç³Ü±ðÌý
10.1 Project: Development of offshore gas fieldsÂ
Year of issueÂ
2020-21Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Labour and working conditions, health and safety, and securityÂ
-
Air, noise and soil quality Â
-
Waste and hazardous substances managementÂ
-
Physical resettlement and economic displacementÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Cultural heritageÂ
Monitoring summaryÂ
Force Majeure was called by Total in April 2021 due to the deteriorating security situation. Construction works have been put on hold.
11. °¿³¾²¹²ÔÌý
11.1 Project: Construction and operation of a natural gas liquids (NGL) extraction plant, NGL pipeline and a petrochemical complexÂ
Year of issueÂ
2015-16Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Noise and Air Quality Labour and working conditionsÂ
-
Health and safety / contractor managementÂ
Monitoring summaryÂ
IESC monitoring report received and reviewed.
11.2 Project: Construction and operation of Duqm oil refineryÂ
Year of issueÂ
2018-19Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Worker welfareÂ
-
Health and safety Â
-
Noise and air qualityÂ
-
Waste management Â
-
Resource efficiency Â
Monitoring summaryÂ
IESC monitoring reports received and reviewed. Several incidents reported in the FY 2023.
12. Saudi ArabiaÂ
12.1 Project: Construction and operation of Saudi Kayan refinery and petrochemical plantÂ
Year of issueÂ
2010-11Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Health and safety Â
-
Emergency responseÂ
Monitoring summaryÂ
No known material environmental or social issues.
12.2 Project: Construction and operation of Sadara hydrocarbon and chlorine-based production complexÂ
Year of issueÂ
2013-14Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safety Â
Monitoring summaryÂ
IESC monitoring report received and reviewed.
13. ³§±ð²Ô±ð²µ²¹±ôÌý
13.1 Project: Construction and rehabilitation of multiple roads within the national road network of Senegal (Project Strada)Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk framework
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Line of credit, Buyer Credit GuaranteeÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Stakeholder engagement
-
Grievance mechanisms
-
Emergency planning and response
-
Worker welfare and occupational health and safety
-
Supply chain management
-
Noise, vibrations, dust and air emissions
-
Hazardous materials, waste and drainage management
-
Materials management in relation to shared resources and/or associated facilities
-
Community health, safety and security
-
Traffic management
-
Potential for physical and economic displacement
-
Biodiversity management
-
Cultural heritage and  Â
-
Monitoring and reporting for multiple project component locationsÂ
Monitoring summaryÂ
This is a line of credit with multiple tranches containing both physical and financial components. No tranches contain physical components have been approved yet hence monitoring requirements have not yet commenced.
14. ³§±ð°ù²ú¾±²¹Ìý
14.1 Project: Design, construction and maintenance of a new motorway (Morava Corridor)Â
Year of issueÂ
2021-22Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit GuaranteeÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Air emissions and climate changeÂ
-
Noise and vibrationÂ
-
Soil qualityÂ
-
Waste managementÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Land acquisition and livelihood impactsÂ
-
Occupational and community health and safetyÂ
-
Worker welfareÂ
-
Cultural heritageÂ
-
Visual impactsÂ
Monitoring summaryÂ
IESC monitoring reports received and reviewed.
15. °Õ²¹¾±·É²¹²ÔÌý
15.1 Project: Construction of an offshore wind farm (Formosa 2)Â
Year of issueÂ
2019-20Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Health and safety Â
-
Underwater noise pollutionÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Economic displacement Â
Monitoring summaryÂ
IESC monitoring reports received and reviewed.
15.2 Project: Construction of an offshore wind farm (Changfang and Xiado)Â
Year of issueÂ
2019-20Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches and Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Health and safety Â
-
Underwater noise pollutionÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
-
Economic displacement Â
Monitoring summaryÂ
IESC monitoring report received and reviewed.
15.3 Project: Construction of an offshore wind farm (Changhua)Â
Year of issueÂ
2021-22Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Labour and working conditions, including occupational health and safetyÂ
-
Management of thirds-party contractors and suppliersÂ
-
Biodiversity and underwater noise pollutionÂ
-
Community engagement and grievance mechanismsÂ
-
Marine traffic management and marine safetyÂ
-
Economic displacement and livelihood restoration Â
Monitoring summaryÂ
IESC monitoring report received in June 2024 and it is being reviewed.
15.4 Project: Construction of an offshore wind farm (Northland Power)Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project FinanceÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
air pollution
-
health and safety
-
social and community impacts
-
marine habitats
-
biodiversity, particularly migratory birds
-
emergency planning and response
-
grievance mechanisms
-
worker conditions of contract andÂ
-
community engagement
Monitoring summaryÂ
IESC monitoring reports received and reviewed for Q3 and Q4 2023. Next report is due imminently for Q1 2024.
16. °Õ²¹²Ô³ú²¹²Ô¾±²¹Ìý
16.1 Project: Expansion and upgrade of an existing Airport (Pemba)Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Physical and economic displacement
-
Biodiversity
-
Occupational health and safety
-
Climate change
-
Emissions to air
-
Noise impacts
-
Waste management
-
Emergency planning and response
-
Community health and safety and Â
-
Community engagement
Monitoring summaryÂ
Design works are ongoing and therefore construction, and hence E&S monitoring, has not yet commenced.
16.2 Project: Construction of 3 roads Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Physical and economic displacement
-
Biodiversity
-
Occupational health and safety
-
Climate change
-
Emissions to air
-
Noise impacts
-
Wastewater treatment
-
Waste management
-
Emergency planning and response
-
Community health and safety andÂ
-
Community engagement
Monitoring summaryÂ
Design works are ongoing and therefore construction, and hence E&S monitoring, has not yet commenced.
17. °Õ³Ü°ù°ì±ð²âÌý
17.1 Project: Design, construction and operation of a solar power plant (Kalyon)Â
Year of issueÂ
2021-22Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Labour and working conditionsÂ
-
Human rights risks in the supply chainÂ
-
Resource efficiency (in particular the use of water)Â
-
Land, air and water emissionsÂ
-
Wastewater, waste and hazardous material managementÂ
-
Community health and safety, including the use of security personnelÂ
-
Land acquisition and economic displacementÂ
-
Biodiversity, including the potential presence of critical habitatsÂ
-
Stakeholder engagement Â
Monitoring summaryÂ
IESC reports received and reviewed.
17.2 Project: Development and operation of a double-track high-speed rail (Ankara-Izmir)Â
Year of issueÂ
2021-22Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Physical and economic displacementÂ
-
Biodiversity, including impacts on critical habitatsÂ
-
Occupational health and safetyÂ
-
Air and noise emissionsÂ
-
Impacts on land and waterÂ
-
Waste and hazardous material managementÂ
-
Wastewater treatmentÂ
-
Construction camp conditionsÂ
-
Community engagement Â
Monitoring summaryÂ
Self-monitoring report received and reviewed. IESC reports received and reviewed.
17.3 Project: Development and operation of a new Urea Production Plant in the Gemlik District of Bursa, °Õ³Ü°ù°ì±ð²âÌý
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Labour and working conditions, including occupational health and safety and work, conditions of contract
-
Wastewater, waste and hazardous material management
-
Community health and safety
-
Community engagement
-
Emergency planning and response andÂ
-
Emissions to air / climate change
Monitoring summary
The IESC and UKEF visited the site in May 2024, following an environmental spill in November 2023. Construction activities were halted for four months and resumed in April 2024. Breaches of E&S obligations recorded.
17.4 Project: Construction and operation of the MERSIN-ADANA-OSMANIYE-GAZIANTEP (MAG) high-speed rail (HSR), °Õ³Ü°ù°ì±ð²âÌý
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
physical displacement
-
biodiversity and natural habitats
-
occupational health and safety
-
emissions to air
-
noise impacts
-
wastewater treatment
-
waste and hazardous material management
-
emergency planning and response
-
construction camp conditions
-
community health and safety andÂ
-
community engagement
Monitoring summaryÂ
IESC monitoring reports received and reviewed. Potential breaches of the E&S obligations.
17.5 Project: Construction and operation of a double-track high-speed rail (Yerköy-Kayseri)Â
Year of issueÂ
2022-23Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches / Equator PrinciplesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
physical and economic displacement
-
critical habitats
-
occupational health and safety
-
air, noise and vibration impacts
-
wastewater treatment
-
waste and hazardous material management
-
emergency planning and response
-
construction camp conditions
-
grievance mechanisms andÂ
-
community engagement
Monitoring summaryÂ
First IESC monitoring report received in February 2024.
18. ±«²µ²¹²Ô»å²¹Ìý
18.1 Project: Construction of a new international airport at KabaaleÂ
Year of issueÂ
2017-18Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct Lending Â
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Noise and air pollutionÂ
-
Water abstractionÂ
-
Labour and working conditionsÂ
-
Health and safety / contractor managementÂ
-
Physical resettlement and livelihood restorationÂ
-
Biodiversity managementÂ
Monitoring summaryÂ
IESC monitoring report received and reviewed.
18.2 Project: Construction of ancillary works for industrial park (Kampala)Â
Year of issueÂ
2020-21Ìý
Applicable ESHR risk frameworkÂ
OECD Common ApproachesÂ
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Buyer Credit Guarantee / Direct LendingÂ
Project PhaseÂ
°ä´Ç²Ô²õ³Ù°ù³Ü³¦³Ù¾±´Ç²ÔÌý
Key risksÂ
-
Labour and working conditions, and health and safetyÂ
-
Air quality and noise Â
-
Wastewater, waste and hazardous substances managementÂ
-
Economic displacementÂ
-
µþ¾±´Ç»å¾±±¹±ð°ù²õ¾±³Ù²âÌý
Monitoring summaryÂ
Self-monitoring reports received and reviewed. No IESC monitoring reports received due to contractual issue. Delays in completion of biodiversity actions. Delivery of an IESC report to UKEF’s satisfaction is required as a condition of availability period extension.
19. ³Õ¾±±ð³Ù²Ô²¹³¾Ìý
19.1 Project: Construction and operation of the Nghi Son petrochemical refineryÂ
Year of issueÂ
2013-14Ìý
Applicable ESHR risk frameworkÂ
OECD Common Approaches Â
±Ê°ù´Ç»å³Ü³¦³ÙÌý
Project Finance Â
Project PhaseÂ
°¿±è±ð°ù²¹³Ù¾±´Ç²Ô²õÌý
Key risksÂ
-
Environmental pollutionÂ
-
Labour and working conditionsÂ
-
Health and safety Â
-
Social issues / stakeholder engagementÂ
Monitoring summaryÂ
Annual IESC monitoring report received and reviewed.